Experience in implementing modular complexes for industry and infrastructure facilities
Over the years, we've completed projects of varying sizes—from individual modular buildings to fully fledged camps for companies in the mining, metallurgy, energy, and construction industries. Each facility is manufactured in-house using Flat Pack technology and a high degree of prefabrication.
Khromtau
Shift camp for ERG Capital Projects
A modern modular camp for temporary workers, built for the Koper Skipovaya project.
The project was completed using Flat Pack technology, with a full production cycle, from engineering design to interior finishing and assembly. Thanks to its high level of prefabrication, construction and commissioning timelines were significantly reduced.
3421,1 m2
Modeles: 248
Ridder
Shift camp for Kazzinc
A complex of modular buildings for the reconstruction of a hydrometallurgical plant.
A high degree of factory readiness allowed us to minimize the volume of installation work on site and ensure rapid commissioning of the facilities.
2232,3 m2
Modules: 158
PSI Stroy Industria
Dormitory for the construction of a 310 MW combined cycle power plant
A two-story modular dormitory was built to accommodate construction personnel for the construction of a combined cycle gas turbine power plant.
The project was implemented using Flat Pack technology with a full production cycle and a high degree of factory readiness, which allowed for rapid installation and prompt commissioning of the facility.
1411,2 m2
Modules: 100